Kilowatt Electrical

Kilowatt Electrical

ADU Electrical · Long Beach & OC

Full electrical design and installation for accessory dwelling units. Permits, subpanels, and local code compliance.

Scope of Work

What We Do

Subpanel installation for ADU circuits
Permit-ready electrical plans
Dedicated circuits for kitchen, laundry, and HVAC
Code-compliant grounding and bonding
Final inspection coordination

Context

Why It Matters

Long Beach and most Orange County cities require permits for ADU electrical work. We handle design, permitting, and installation so your unit meets current code and passes inspection first try.

ADUs need dedicated circuits for kitchen, laundry, and HVAC. We size subpanels correctly, run conduit straight, label the panel, and wire to local building standards.

Gallery

Project Photos

Common Questions

FAQ

Do ADUs need their own electrical panel?

Most ADUs need a subpanel or dedicated service. We design, permit, and install to local code in Long Beach and OC.

How long does ADU electrical work take?

Typically 2–4 weeks from permit to final inspection, depending on scope and city.

Do you pull permits for ADU electrical?

Yes. We handle Long Beach, Orange County, and city permits and coordinate inspections.

Ready to Power Your ADU?

Get a free estimate. We typically respond within 2 hours during business hours.

(714) 908-9602Free Estimate